Open Data Service

HP Air

map showing location of facility
View Larger Map

The Institute of Sound & Vibration Research (ISVR) maintains a High Pressure Air Facility which can deliver air up to 20Bar (280psi) to the following areas in the Faculty of Engineering and the Environment: B13 Tizard Doak Laboratory (Room 1023) B15 Rayleigh Reverberation (Chamber Room 1031) The use of the facility is potentially hazardous due to the high jet velocities and high air pressures involved. To minimise the risk of injury to oneself and damage to the rig it is essential that all users of the rig strictly adhere to the Operational Procedure (under review). Details and further information can be obtained from Ged Goldsmith, Faculty Technical Manager

Contact

to be assigned, Dummy - +442380595988

Information

RCUK Costed:
No
School/Dept:
Faculty of Engineering and the Environment
Building:
Tizard
If you have additions or corrections to a facility or equipment entry please contact your Faculty Finance Team.

Get the Data

You can download the raw data used to create this page:

The following open datasets were used to build this page:

© 2025 University of Southampton